title1. Templates- reworded to “Workflow templates” across the system

Image Removed

Expand
title2. Workflow template selection on order creation- changed color of buttons

“Use full template including all products” column- color of selection buttons changed from orange to blue. Functionality remained the same

...

Expand
title4. “Today” scheduler pages- completed tasks can now also be displayed in the calendar grids

In all scheduler pages, completed tasks are not displayed. Once the task is completed it is cleared from the scheduler grid.

In “Today” scheduler pages only, added a button to also display completed tasks.

From: Supervisor > Schedule > Today scheduler manipulation + Today scheduler assigning pages > Display also completed tasks button (fig 3).

Once clicked, completed tasks will be displayed in both “Day” and “Timeline” tabs (fig 4).

Completed tasks will have a black background and the frame will be colored differently per each assigned resource.

Image RemovedImage Added

In addition, added system configuration to have the “Display also completed tasks” enabled by default when navigating to this page. Users will still be able to disable, but this would be the default when navigating to the page.

From: Administrator > Web administrator > Configuration > Settings > Scheduling preferences section > “Today” scheduler pages- display also Completed tasks” switch (fig 5):

...

Expand
title7. Add role to enable seeing Product and Task messages in the order, regardless to assignment

Role name: Display all messages regardless to assignment

The role will enable users to see all messages in the order, including Task and Product messages that they are not assigned to and would normally only be visible to assigned users and to the message creator.

Expand
title8. Update of the Task internal supply date when changing the Task supply date- introducing new sync logic

Note: relevant only in systems in which the Task internal supply date is enabled.

The sync logic will determine how will the Task internal supply date be influenced when changing the Task supply date, or when changing any other date that the Task supply date is linked to.

Before changing the Task supply date, or any other date linked to the Task supply date, the user can select 1 of 2 options:

  1. Always sync- when the Task supply date is changed, the Task internal supply date will always follow

  1. Smart sync (checks if assigned)

Option #1- Always follow:

When setting the Task supply date to an earlier or later date, the Task internal supply date will:

Always follow (regardless if the task is assigned or not)

Option #2- Smart sync:

Backward:

When setting the Task supply date to an earlier date which is prior to the Task internal supply date, the Task internal supply date will:

·         Always follow (regardless if the task is assigned or not)

When setting the Task supply date to an earlier date which is till later than the Task internal supply date, the Task internal supply date will:

·         Follow if the task is not assigned

·         Not follow if the task is assigned

Forward:

When setting the Task supply date to a later date, the Task internal supply date will:

·         Follow if the task is not assigned

·         Not follow if the task is assigned

How to use:

The new 2 sync options are represented by 2 buttons that were added in most pages that display dates.

Before changing the Task supply date, or any other date linked to the Task supply date (Order supply date, Order internal supply date or Step date), select the necessary sync option to receive the required result (each button has a tool tip to explain its functionality):

Image Added

System configuration also added to determine which of the 2 options will be the default sync method when navigating to any page.

From: Administrator > Web administrator > Configuration > Settings > System preferences section > Task supply and Task internal supply dates sync method button:

Image Added

In addition, please note that the connection button will no longer turn red when Task internal date is disconnected from the Task supply date:

Image Added

The connection button will currently only turn red when the Task supply date is disconnected from the “Set date by” date its linked to (either the Order supply date, Order internal supply date or Step date).