In all assigning scheduler pages:
When clicking the “Tasks” (fig 1) button at the bottom of the page, the Tasks section is opened.
A “Previous task” column (fig 2) was added to the Tasks section to provide additional information when assigning:
In addition, improved the performance of the drag and drop of tasks from the Tasks section into the calendar and of the “Tasks” section pin functionality