This split can be done based on both duration and subtitles, if available.

In the case of realtime tasks, only duration is available as an option to split.

It is also possible to split a task based on the split of the previous task and for each individual subtask to be connected to the corresponding previous one.

...

Click “Finish” (7) to split the task.

...

After the task is split, the main task will be assigned to the "Split" resource, followed by the number of subtasks.

The tooltip will also indicate which resources were assigned.

Additionally, both the "Split" and "Task info" columns will change to indicate the change, and clicking on them will open the subtasks page.

...

Splitting by subtitles

To split a task by subtitles, two criteria need to be met:

...

Click “Finish” (7) to split the task.

...

After the task is split, the main task will be assigned to the "Split" resource, followed by the number of subtasks.

The tooltip will also indicate which resources were assigned.

Additionally, both the "Split" and "Task info" columns will change to indicate the change, and clicking on them will open the subtasks page.

...

Splitting consecutive tasks

When splitting a task, it’s also possible to use the same split as the previous task.

This makes it possible to Using this split, resources can start working on a subtask in the second task as soon as the corresponding part of the first task is completed.

...

Click “Finish” (7) to split the task.

...

Splitting realtime tasks

 To split a task by duration, click on the “Split” (1) icon of the task to open the wizard. Realtime tasks can only be split by duration (2).

...

Select in how many parts the task should be split and whether they should all be the same duration (3) and click “Next” (4). 

...

In the Assignment page, the "Start Time" and "Schedule End Time" of each individual subtask can be edited. If required, these can also overlap.

Optional: Resources can be assigned to each subtask (6).

These changes also be done at any moment after the task has been split from the subtasks page.

Click “Finish” (7) to split the task.

...

After the task is split, the main task will be assigned to the "Split" resource, followed by the number of subtasks.

The tooltip will also indicate which resources were assigned.

Additionally, both the "Split" and "Task info" columns will change to indicate the change, and clicking on them will open the subtasks page.

...

Subtasks page

Once a task has been split, the “Split” icon will change to green to indicate that it has been split.

...

Lastly, all subtasks can be merged, converting the split task back into a normal task.

...

In the case of realtime tasks, the subtasks page will also allow the user to edit the Test Time, Start Time and Scheduled End Time of each subtask:

...