Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Expand
titleLanguage pairs added to resources (3385)

Languages can now be added to resources as language pairs, instead of as just source and target languages, enabling more control over what tasks a resource can be assigned to:

image-20240222-123913.pngImage Removed

Once enabled, populate the Source language (1) and Target language (2) fields. The system will generate a list of possible language pairs.

image-20240222-124157.pngImage Removed

After saving, the selected language pairs will be added to the list and will be applied when assigning the resource to tasks.

image-20240222-124405.pngImage Removed

The icon for Languages in the resource’s profile and in the resources page will change to indicate language pairs are being used:

image-20240222-124609.pngImage Removed
Info

A resource can only use either languages or language pairs.

If a user has both set up, only the currently enabled option will be applied.

Expand
titleSplit tasks - complete rework (3985)

The split task functionality has been completed reworked.

A split wizard has been added.

Tasks can now be split by either duration, number of subtitles, or split according to the previous task in the flow.

The split will also be reflected in the Toolkit:

image-20240314-182050.pngImage Removed
Info

For a more detailed explanation of the new functionalities, please check the Split tasks manual.

Expand
titlePivot language implemented (3517)

Support for pivot languages has been added.

If used, the system will treat the first selected target language as pivot. The remaining languages will treat the pivot language as the . Read more about Language pairs in the manual.

image-20240222-124405.pngImage Added
Expand
titleSplit tasks - complete rework (3985)

The split task functionality has been completed reworked.

A split wizard has been added.

Tasks can now be split by either duration, number of subtitles, or split according to the previous task in the flow.

The split will also be reflected in the Toolkit:

image-20240314-182050.pngImage Added
Info

For a more detailed explanation of the new functionalities, please check the Split tasks manual.

Expand
titlePivot language implemented (3517)

Support for pivot languages has been added.

If used, the system will treat the first selected target language as pivot. The remaining languages will treat the pivot language as the source language to filter assignable resources and assign rates.

This functionality can be enabled from: Administrator > Web administrator > Configuration > Settings.

image-20240402-145257.png
Info

To learn more about this functioanlity, please check the Pivot language manual.

...

Expand
titleFiltering and Order creation for multiple media numbers added to the range options (4757)

Using the range options, it’s now possible to filter for a specific list of media numbers.

This functionality is available within the range options page, and allows for the search of multiple media numbers at once.

image-20241204-172035.pngImage Removedimage-20241204-171753.pngImage Removed

Introducing new features for multiple media numbers in the range options: filtering and order creation for multiple media numbers.

Info

Please refer to our help desk article to learn more about this functionality: https://ooona.atlassian.net/wiki/spaces/OHC/pages/2351366145/Range+options#Filteroptions#Filtering-and-Order-creation-for-specificmultiple-media-numbers

These new features are available within the range options page.

image-20241204-172035.pngImage Addedimage-20241204-171753.pngImage Added
Expand
titleAutomatic status change on pre-production completion implemented (3520)

From: Administrator > Web administrator > Configuration > Defaults tab

A new option was added to the system: Change orders to 'In progress' once all pre-production tasks are completed

If enabled (1), the status of orders will automatically change to “In progress”, making it visible to basic resources.

Additional settings were also added to notify the resource in charge of the orders that the status was automatically changed (2). The standard task assignment notification can also be sent out for resources assigned to tasks within these orders (3).

Info

These notifications are not sent out immediately. The system will send them out every 15 minutes. If multiple orders changed status using this functionality within that time frame, a single email with all affected orders/tasks will be sent out.

image-20240405-162728.png

...

Expand
titleAutomatic resource notification on task changes (4266)

It is now possible to send automatic notifications to resources if changes are applied to tasks they are assigned to:

image-20240530-091728.png

These notifications can be enabled from Administrator > Web administrator > Application configuration > Emails:

image-20240530-091046.png
Info

For a more detailed explanation, please check the Automatic notification of changes to a task section of the System notifications help desk article.

Expand
titleRequire resource reference - New system setting added (4950)

In Administrator > Configuration > Settings a new system setting was added to determine if resources must enter a reference number when submitting a Resource report.

Additionally, entering a reference number will no longer lock the report or it’s items for editing, only submitting it will do so.

image-20241105-074234.pngImage Modified


Projects improvements

The “Projects” functionality has undergone multiple changes to improve usability:

...

Expand
titleExport to excel button was added to more tabs within Project dashboard page (4253)
  • Project dashboard (main page)

  • Status tab

  • Project files tab

  • Project member tab

image-20240819-114452.pngImage Removed

  • main page)

  • Status tab

  • Project files tab

  • Project member tab

image-20240819-114452.pngImage Added

Expand
titleLead times - expanded to include minutes (4813)

The lead time functionality has been expanded to allow using minutes as well.

Using the new field, the Order internal supply date, as well as the Task supply dates, can be automated with more detail:

Image Addedimage-20241218-113122.pngImage Added

The same dates can also be automated through the workflow templates, using the same column, from Manager > Price lists & Workflow templates > Workflow templates.

image-20241218-114737.pngImage Addedimage-20241218-114809.pngImage Added

This functionality can be enabled from Administrator > Web administrator > Configuration > Settings > Enable lead minutes:

image-20241218-114922.pngImage Added

...

Other improvements and changes

...

Expand
titleRoles and Role groups - added log (3090)

Added a changes log to Roles and Role groups pages.

In Roles:

image-20240326-155235.png

In Role groups:

image-20240326-155250.png

Security

Expand
titleTwo-factor authentication switch - can only be modified by OOONA users (5045)

The Two-factor authentication will now be locked for change to all users beside OOONA users.

image-20241217-155534.pngImage Added

Expand
titleAdded button to test authentication manner at the system and resource level (3880)

Added a button to test the current authentication manner to Administrator > Web administrator > Configuration > Security.

image-20240221-101538.png

The same test is also available in the Resource info page.

image-20240221-102043.png

...